About Rasuwa Hydropower Limited
Developing sustainable hydropower infrastructure to contribute reliable and renewable energy to Nepal’s national grid.
Company Overview
Rasuwa Hydropower Limited is a Nepali hydropower development company established on 2066/02/04 B.S. with the objective of developing sustainable hydropower infrastructure in Nepal. The company is registered in Kathmandu and operates as a limited company engaged in the development, construction and operation of hydropower projects. With a focus on responsible energy development, the company aims to harness Nepal’s abundant water resources to contribute reliable and environmentally sustainable electricity to the national grid.
The company is currently developing the Phalakhu Khola Hydropower Project, a 7.29 MW run-of-river hydropower project located in Naukunda Rural Municipality–4, Bhorle, Rasuwa District, Bagmati Province, Nepal. The project utilizes water from the Phalakhu River system and is designed with a gross head of approximately 181.95 meters and a design discharge of 5.03 cubic meters per second, enabling an estimated annual energy production of 38.74 GWh. Electricity generated by the project will be transmitted through a 33 kV transmission line to the Trishuli 3B Hub Substation of the Nepal Electricity Authority.
Rasuwa Hydropower Limited is supported by experienced promoters, technical experts and financial professionals involved in hydropower development, engineering, project management and infrastructure investment. Through the development of hydropower projects, the company aims to strengthen Nepal’s energy security while contributing to sustainable infrastructure development and long-term economic growth
🎯
Primary Objective
To develop and implement the Phalakhu Khola Hydropower Project (7.29 MW) in Rasuwa District, utilizing Nepal’s natural river resources to generate clean and renewable electricity for the national grid.
🎯
Secondary Objective
To identify, study and develop additional hydropower and renewable energy opportunities within Nepal by applying modern engineering practices, sustainable environmental standards and sound financial management.
Company Information
Company Name
Rasuwa Hydropower Limited
Establishment
2066/02/04 B.S.
Registration Number
62812/065/066
Registered Office
Banasthali Chock, Kathmandu
Project Site Office
Naukunda Rural Municipality-4, Bhorle, Rasuwa
PAN Number
303630092
Generation License
B.B 72/073 BU 161
Executive Chairman
Mr. Deepak Thapa
Authorized Capital
NPR 40 Crore
Issued Capital
NPR 40 Crore
Paid-up Capital
NPR 24.35 Crore
Number of Shareholders
61 Shareholders
Board of Directors
5 Members
Project Status
Under Construction