Phalakhu Khola Hydropower Project
7.29 MW Run-of-River Development
Developed by Rasuwa Hydropower Limited, contributing clean and reliable energy to Nepal’s national grid.
7.29 MW
Installed generation capacity
38.74 GWh
Annual energy production
Rs 147 Crore
Total project investment
Rasuwa District
Naukhunda Rural Municipality
About Rasuwa Hydropower Limited
Rasuwa Hydropower Limited was established in 2066 B.S. to develop hydropower projects in Nepal. The company is currently developing the 7.29 MW Phalakhu Khola Run-of-River Hydropower Project in Rasuwa District.
The project contributes clean, renewable energy to Nepal’s national grid while supporting regional infrastructure and economic growth.
Learn More➡️

Phalakhu Khola Hydropower Project
The Phalakhu Khola Hydropower Project is a 7.29 MW run-of-river development located in Naukhunda Rural Municipality, Rasuwa District. Developed by Rasuwa Hydropower Limited, the project harnesses the flow of the Phalakhu River to generate clean and renewable energy for Nepal’s national grid. With an annual production of 38.74 GWh, the project contributes to Nepal’s sustainable energy future while supporting local economic growth and infrastructure development.
Run-of-River Design
Environmentally friendly generation without large reservoir storage.
National Grid Connected
Interconnected to Trisuli 3B Substation via 33kV transmission line.
Clean Renewable Energy
Contributing 38.74 GWh annually to Nepal’s power system.
Project Gallery
Explore images from the Phalakhu Khola Hydropower Project